Environment Design / Project 2
Project 2: Interior and set Design |
Deadline : Week 12 |
continue and develop interior design that best reflects Project 1. |
Process
1st consultation
- change and check on the scale of the interior
- sketch 3 more idea for interior
- make the space more bigger and not too small
2nd consultation
- the room are still too small can make it bigger
- mark the window and all
- start to sketch
- remove the big clock on the floor
3rd consultation
- the base are there but the space are too small
- add more things in the room
- give it a story
- put on color for submission
Proposal
Final outcome
Project 02 reflection
In Project two, while creating an interior based on Project one, I came up with the idea of a workshop for the clock tower to function. However, during the creation process, I faced some problems with scale and determining what to include in the space. I was concerned about making the area too empty. To overcome these challenges, I sought suggestions from Mr. Kannan and also found inspiration online to avoid the space looking too barren.
To address the issues of scale and perspective, I utilized Blender to navigate through the problem of a narrow and small space. After implementing these solutions, I encountered difficulty in the coloring process. I opted for a vintage and woody feel, choosing brown tones to achieve this. Additionally, I added textures to the tables and the overall space.
Throughout this assignment, I realized that creating an interior is challenging, especially in handling scale and determining what elements to include to make it cohesive and tell a story.
Comments
Post a Comment