Environment Design / Project 2


Project 2:
Interior and set Design  
Timeframe : Week 09-12
Deadline   : Week 12

continue and develop interior design that best reflects
Project 1.

Process

1st consultation

  • change and check on the scale of the interior
  • sketch 3 more idea for interior
  • make the space more bigger and not too small  
2nd consultation
  • the room are still too small can make it bigger
  • mark the window and all 
  • start to sketch 
  • remove the big clock on the floor 
3rd consultation
  • the base are there but the space are too small 
  • add more things in the room
  • give it a story 
  • put on color for submission 

Proposal 


Final outcome





















Project 02 reflection
In Project two, while creating an interior based on Project one, I came up with the idea of a workshop for the clock tower to function. However, during the creation process, I faced some problems with scale and determining what to include in the space. I was concerned about making the area too empty. To overcome these challenges, I sought suggestions from Mr. Kannan and also found inspiration online to avoid the space looking too barren. 

To address the issues of scale and perspective, I utilized Blender to navigate through the problem of a narrow and small space. After implementing these solutions, I encountered difficulty in the coloring process. I opted for a vintage and woody feel, choosing brown tones to achieve this. Additionally, I added textures to the tables and the overall space. 

Throughout this assignment, I realized that creating an interior is challenging, especially in handling scale and determining what elements to include to make it cohesive and tell a story.

Comments

Popular Posts